Search

Paramjit S Girn

from Aurora, OH
Age ~53

Paramjit Girn Phones & Addresses

  • 180 Yorkshire Dr, Aurora, OH 44202 (248) 882-4476
  • Kissimmee, FL
  • 3284 Springwood Ct, Orion Township, MI 48359 (248) 391-5388
  • 3284 Springwood Ct APT 20, Lake Orion, MI 48359 (248) 391-5388
  • Orion, MI
  • Auburn Hills, MI
  • Oakland, MI
  • Minneapolis, MN
  • 180 Yorkshire Dr, Aurora, OH 44202 (248) 841-6490

Work

Position: Sales Occupations

Education

Degree: Bachelor's degree or higher

Publications

Us Patents

Robotic Trailer Loading/Unloading System

View page
US Patent:
20070160449, Jul 12, 2007
Filed:
Jan 12, 2006
Appl. No.:
11/330672
Inventors:
Paramjit Girn - Lake Orion MI, US
Brian Johnson - Rochester Hills MI, US
Michael Turnbull - Rochester Hills MI, US
Amit Kolhatkar - Rochester Hills MI, US
International Classification:
B65G 67/00
US Classification:
414390000
Abstract:
A loading/unloading system for a trailer includes at least one loader/unloader positioned adjacent an opening of the trailer that incrementally removes material from the trailer. A material handling device is movable relative to the loader/unloader and transports material from the loader/unloader to a predetermined location within a manufacturing facility.

Robotic Frame Handling System

View page
US Patent:
20080251351, Oct 16, 2008
Filed:
Apr 11, 2007
Appl. No.:
11/734016
Inventors:
James G. Powers - Warren MI, US
Allan C. McNear - Farmington Hills MI, US
Ronald M. Laux - Shelby Twp. MI, US
Robert A. Florian - Franklin MI, US
Paramjit S. Girn - Lake Orion MI, US
International Classification:
B65G 47/248
B65G 35/06
US Classification:
198402, 198618, 901 31, 901 47, 901 22
Abstract:
A system for handling vehicle frames. The system includes a conveyor assembly including a loading end and an unloading end, and the conveyor assembly carries a plurality of vehicle frames thereon. The system also includes a frame transfer assembly disposed at the unloading end of the conveyor assembly. The frame transfer assembly may be adapted to grasp a vehicle frame from the conveyor assembly and transfer the vehicle frame from the conveyor assembly. A vehicle frame inversion system is also provided that includes a first robotic inversion device that may include a first clamping system, and a second robotic inversion device that may include a second clamping system. The first and second clamping systems are adapted to grasp a vehicle frame, and the first and second robotic inversion devices are adapted to lift and invert the vehicle frame.
Paramjit S Girn from Aurora, OH, age ~53 Get Report